Perancangan Ulang Tata Letak Fasilitas Produksi Spun Pile Untuk Meminimalisasi MaterialHandling

UNIVERSITAS BINA DARMA, UNIVERSITAS BINA DARMA (2022) Perancangan Ulang Tata Letak Fasilitas Produksi Spun Pile Untuk Meminimalisasi MaterialHandling. Perancangan Ulang Tata Letak Fasilitas Produksi Spun Pile Untuk Meminimalisasi MaterialHandling.

[img]
Preview
Text
PERANCANGAN ULANG PRODUKSI SPUN.pdf

Download (381kB) | Preview
Official URL: https://www.binadarma.ac.id

Abstract

At manufacturing facilities planning companies include determining how to support production activities. Product handling cannot be separated from the initial to the end of production system before customer distribution is carried out. For this reason, a cost emphasis effort is needed by increasing effectiveness, efficiency and productivity. One way that can be done is to maxime the layout of production facilities. The problem facing the company today is irregularity in the placement of production stations. The objectives to be achieved by researchers are. (1) Redesigning the layout of production facilities, (2) Calculate material handling costs. The method used in solving this Problem is the method of Systematic Layout Planning. From the results of the study, there were 11 work stations with initial layout with material handling cost of Rp. 2.126.968.222,5, while the proposed into layout obtained 11 work element grouped into 4 work stations with material handling costs Rp. 1.700.181.429,8,- per month. Resulting in decrease in material handling cost by 20,06%.

Item Type: Article
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Electronics and Computer Science
Depositing User: Mr Edi Surya Negara
Date Deposited: 16 Jun 2022 01:23
Last Modified: 16 Jun 2022 01:23
URI: http://eprints.binadarma.ac.id/id/eprint/10973

Actions (login required)

View Item View Item