Peningkatan Jumlah Produksi Slat Pensil Menggunakan Maynard Operation Sequence Technique

Ch. Desi ,, Kusmindari and Hasmawaty, AR (2019) Peningkatan Jumlah Produksi Slat Pensil Menggunakan Maynard Operation Sequence Technique. In: Bina Darma Conference on Engineering Science, Universitas Bina Darma.

WarningThere is a more recent version of this item available.
[img]
Preview
Text
Prosiding PENINGKATAN JUMLAH PRODUKSI SLAT PENSIL MENGGUNAKAN MAYNARD OPERATION SEQUENCE TECHNIQUE.pdf

Download (413kB) | Preview
Official URL: http://conference.binadarma.ac.id/index.php/BDCES

Abstract

A job will be said to be completed efficiently if the completion time is the shortest. Successful measures of a production system in an industry are usually expressed in terms of productivity or the amount of output and input produced. The purpose of this study was to determine the standard production time and to determine the standard time before and after analysis using MOST. The result of standard time measurement using stop clock is 190.39 seconds, the result of the measurement with MOST before analysis is 139.72 seconds, the MOST after analysis is 112 seconds. The standard output using the old working method is 189 units of pencil slat per hour, and the standard output using MOST is 321 units of hourly pencil slats. Looking at the results of this study it is suggested that companies can consider implementing the research results obtained. Keywords: Measurement of work, MOST and standard time

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > TD Environmental technology. Sanitary engineering
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Mr Sably Aliya
Date Deposited: 04 Nov 2019 04:28
Last Modified: 04 Nov 2019 04:28
URI: http://eprints.binadarma.ac.id/id/eprint/4088

Available Versions of this Item

Actions (login required)

View Item View Item