Ch. Desi ,, Kusmindari and Hasmawaty, AR
(2019)
Peningkatan Jumlah Produksi Slat Pensil Menggunakan Maynard
Operation Sequence Technique.
In: Bina Darma Conference on Engineering Science, Universitas Bina Darma.
Preview |
|
Text
Prosiding PENINGKATAN JUMLAH PRODUKSI SLAT PENSIL MENGGUNAKAN MAYNARD OPERATION SEQUENCE TECHNIQUE.pdf
Download (413kB)
| Preview
|
Abstract
A job will be said to be completed efficiently if the completion time is the shortest. Successful
measures of a production system in an industry are usually expressed in terms of productivity or the
amount of output and input produced. The purpose of this study was to determine the standard production
time and to determine the standard time before and after analysis using MOST. The result of standard time
measurement using stop clock is 190.39 seconds, the result of the measurement with MOST before
analysis is 139.72 seconds, the MOST after analysis is 112 seconds. The standard output using the old
working method is 189 units of pencil slat per hour, and the standard output using MOST is 321 units of
hourly pencil slats. Looking at the results of this study it is suggested that companies can consider
implementing the research results obtained.
Keywords: Measurement of work, MOST and standard time
Available Versions of this Item
-
Peningkatan Jumlah Produksi Slat Pensil Menggunakan Maynard
Operation Sequence Technique. (deposited 04 Nov 2019 04:28)
[Currently Displayed]
Actions (login required)
|
View Item |