PERANGKAT LUNAK PENGOLAHAN REALISASI PROYEK PADA PT PERAGA LAMBANG SEJAHTERA PALEMBANG

Husna, Zuryati and Mirza, A.Haidar and Ranius, A.Yani (2012) PERANGKAT LUNAK PENGOLAHAN REALISASI PROYEK PADA PT PERAGA LAMBANG SEJAHTERA PALEMBANG. JURNAL MAHASISWA TI S1.

[img]
Preview
Text
jurnal Zuryati.pdf

Download (51kB) | Preview
Official URL: http://eprints.binadarma.ac.id

Abstract

PERANGKAT LUNAK PENGOLAHAN REALISASI PROYEK PADA PT PERAGA LAMBANG SEJAHTERA PALEMBANG

Item Type: Article
Uncontrolled Keywords: planning, monitoring, controlling, scheduling
Subjects: A General Works > AC Collections. Series. Collected works
A General Works > AI Indexes (General)
A General Works > AS Academies and learned societies (General)
A General Works > AZ History of Scholarship The Humanities
Q Science > QA Mathematics > QA76 Computer software
Divisions: Faculty of Engineering, Science and Mathematics > School of Electronics and Computer Science
Depositing User: Tuan Suryayusra Booter Junior
Date Deposited: 20 Jan 2014 00:38
Last Modified: 20 Jan 2014 00:38
URI: http://eprints.binadarma.ac.id/id/eprint/125

Actions (login required)

View Item View Item